A repositioning and modernisation of a 180,000 sq ft 7 storey building built in 2001. Through targeted interventions to the common areas we changed occupiers perceptions of the building. The scheme included 25k sq ft of best-in-class CAT A workspace, new end of journey facilities, upgrades to the main plant and improvement of the EPC rating from B to A. The Barr Gazetas designed scheme incorporates a high level of material re-use, zero waste to landfill and bio-based mycelium paneling.
The refurbishment was delivered whilst the building was still in occupation as a result of carefully managed phases and continual liaison with the building management and occupier teams.
Investor: British Land PLC
Project Lead: Anthony Chudleigh
Architect: Barr Gazetas
Size (NIA): 27,000 sq ft
Status: Complete (2023)
Lettings: The Guinness Partnership
Sustainability: EPC A / Zero waste to landfill / Material Re-use